EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY assignment-Victoria University Australia

Instruction to students: This is an individual assignment.

Task: EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY assignment

EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY

The Problem and Background

Within the Project Management discipline, there are a number of sectors, such as Information Technology, Engineering, Business, Administration and so on. Each category has its uniqueness and a number of Information Systems exclusive to each category has
been made available in the market place over the years. These systems are not complete in all respects and still there is a lot of work to be done in the industry.

Managing projects requires, ideally, technology to support project processes in addition to Project Planning and Controlling.

To name a few:
 Project Cost Estimating
 Project Accounting and Finance
 Feasibility Studies
 Materials Management
 Project Plant Maintenance and Scheduling
 Asset Management
 Contracts Administration and Management
 and many more…

It is important to recognize that the managing project must embrace the above-mentioned processes. The information systems that support these processes must be seamlessly integrated in order to gain the maximum efficiency and effectiveness.

ORDER This EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY Assignment NOW And Get Instant Discount

Order Your Assignment

The Assignment and Deliverables

Each student is required to pick a sub-category of the Project Management industry or other areas of the sector in the industry.

Investigate various software available that support project processes for the specific category in ONE the following areas within the industry.

 Stakeholder Management
 Risk Management
 Schedule Management
 Communication Management
 Resource Management

Analyze the capabilities of the software and particularly the ability to integrate well with all other software.

The deliverable comprise of a Report not exceeding 2000 Words excluding Appendix (approx. 200 Words per page) or Max 12 pages A4 size, whichever is maximum (Penalty for exceeding the limit), clearly articulating the response required. Use single space, Arial Font and 12 points for this submission The report also should include relevant diagrams outlining the interaction between various software. Findings from literature shall be  clearly quoted appropriately and referenced and attached in the Appendix , in accordance with the guidelines set out by Victoria University.

Report Structure: (Checklist)

 Cover Sheet with Title
 Front Page
 List of Content
 Executive Summary
 Aim/s of the Investigation
 Introduction of the topic
 Significance of this investigation
 Listing and describe the available softwares
 Software Selection for evaluation (at least 3 to be selected)
 Critically Review the selected three Softwares
 Identify and set Criteria for Evaluation
 Discussion on Weighting for each criteria
 Set up Evaluation Matrix
 Justification of weighting criteria for each software ( clear evidence and comparison required)
 Discussion on the results
 Discussion of Problems and Pitfalls
 Recommendation/s
 References
 Appendix: Provide all supporting evidence for each software evaluated.

Marking Rubric: EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY assignment-Victoria University Australia

EPM5700_PROJECT MANAGEMENT AND INFO TECHNOLOGY

ORDER This EPM5700 PROJECT MANAGEMENT AND INFO TECHNOLOGY Assignment NOW And Get Instant Discount

Order Your Assignment

Get PRM701 – Preliminary Project Charter And Management Plan Assignment Written by experts.